Planned projects
Jones to Takatu Realignment
A 100m section of the Matakana to Omaha trail will be re-aligned so that its overall grade is improved and some sharp corners are softened. When the works are completed the trail will be safer for novice riders and families yet the fitness challenge represented by the hill will remain. We had been receiving reports of riders failing to negotiate the bends at the bottom of the hill on the trail. After carefully analysing the
Stage 1: Warkworth to Snells Beach and Matakana
Stage 1: Warkworth to Snells Beach to Matakana: Connects urban centres including businesses, schools, and attractions for locals and visitors alike. Includes future housing and business areas identified in Warkworth and Snells Beach. It provides walking and cycling options for commuters and school kids between these towns. This stage is a family friendly and has a flat grade. It has an estimated cost of construction as $12.7 Million and benefit cost ratio of $1 invested
Point Wells to Matakana Country Park
The Point Wells to Matakana Country Park trail is approximately 2.4km long and is primarily in the AT road corridor along Omaha Flats Road, north eastern side. An Access Easement has been provided by the Matakana Farm Park to take the trail out of the road corridor at their boundary. This trail section connects two significant points of interest and will take cyclists and walkers off the busy Omaha Flats Road. This project is ready
Pūhoi to Mangawhai Trail Business Case
The Matakana Coastal Trail Trust have partnered with WSP Opus to assess the costs and to develop a business case for a trail connecting Pūhoi to Mangawai. The project uses WSP’s methodologies for trail design and costing and involves walking the entire 127km length of the trail with GPS and cameras. This data is then analysed to a 1 metre resolution by engineers to identify the required structures, the appropriate trail construction and any ancillary
Successful projects
Matakana Bridge
The bridge was a $450,000 project to safely connect Matakana township to the Point Wells and Omaha Trails.
Point Wells / Omaha to Matakana Trail
Pt Wells to Matakana Walkway/Cycleway 2010 -16 This walkway /cycleway was planned and built by members of the Matakana Community Group with support from a range of local community trucking, excavating and fencing contractors. Scott MacCallum managed the contract work. There were five separate sections to the walkway Stage one was the building of the walkway through the Rodney District Council wastewater plant property at Jones Road, Omaha. This involved forming a